Perco attends the premises. They carried out the following works:
– Lifted up some of the laminate timber flooring.
– Removed fascia off front of kitchen bench.
– Made ceiling safe from further collapse.
– Setup 4x fans to dry out area which blew ceiling insulation all through the home.