fbpx
15MarBlue RMS

Blue RMS Completes Rectification Works

Rectification works were completed by Blue RMS to a very unsatisfactory standard. The issues with their work is as follows: Poor plaster work. Poor paintwork. Faulty Electrical work. Timber Laminate Flooring in Dining Room and Living Room was not installed correctly which led to buckling of the flooring. Ceiling plaster in bathroom was double-skinned (New...

learn more
15MarBlue RMS

Blue RMS Begins Rectification Works

Blue RMS attends the property to begin rectification works. Scope of works that were carried are outlined in attached document (scope of works): Blue RMS Estimate – SOW

learn more
15MarBlue RMS

Blue RMS Attends Premises

Blue RMS attends premises. They carried out the following works: – Replaced roof tiles. – Temporarily Repaired Ceiling. – Assessed the damaged to prepare for a quote.

learn more
15MarPerco

Perco Attends Premises

Perco attends the premises. They carried out the following works: – Lifted up some of the laminate timber flooring. – Removed fascia off front of kitchen bench. – Made ceiling safe from further collapse. – Setup 4x fans to dry out area which blew ceiling insulation all through the home.

learn more

First Flood Event

First flood event occured. Due to a suspected compromised roof tile, rainwater entered the roof-space and flooded the Kitchen, Dining Room, Lounge Laundry, Bathroom and Bedroom 3. In these rooms, the damage that occured was the following: – Flooring (Laminate Timber, Carpet & Tiling). – Ceilings throughout aforementioned rooms. – Electrical Items (Ceiling Fans). –...

learn more
14Mar

Ambrose Construct – Roof Report

The below is a roof report by Ambrose Construct. This particular report explains that there is no evidence of water ingress in the roof. However, further evidence displays water damage to the eaves and fascia in the patio area of the property. Roof Report Ambrose construct

learn more

© 2022 All rights reserved. Ronin Media - Web Design, SEO & Digital Marketing Melbourne.